ASME PCC-3-2007 Inspection Planning Using Risk-Based Methods

ID

F8CB6D42E39F47CA860ECB0CB4DABB8E

文件大小(MB)

1.05

页数:

92

文件格式:

pdf

日期:

2024-6-23

购买:

购买或下载

文本摘录(文本识别可能有误,但文件阅览显示及打印正常,pdf文件可进行文字搜索定位):

Inspection,Planning Using,Risk-Based,Methods,A N A M E R I C A N N A T I O N A L S T A N D A R D,ASME PCC-3–2007,--`,``,`,,,````````,`,`,`,`,,,-`-`,,`,,`,`,,`---,ASME PCC-3–2007,Inspection,Planning Using,Risk-Based,Methods,AN A M E R I C A N NAT I O N A L STANDARD,--`,``,`,,,````````,`,`,`,`,,,-`-`,,`,,`,`,,`---,Date of Issuance: June 30, 2008,The 2007 edition of this Standard is being issued with an automatic addenda subscription service.,The use of addenda allows revisions made in response to public review comments or committee,actions to be published as necessary; revisions published in addenda will become effective 6 months,after the Date of Issuance of the addenda. This Standard will be revised when the Society approves,the issuance of a new edition.,ASME issues written replies to inquiries concerning interpretations of technical aspects of this,Standard. The interpretations will be included with the above addenda service.,ASME is the registered trademark of The American Society of Mechanical Engineers.,This code or standard was developed under procedures accredited as meeting the criteria for American National,Standards. The Standards Committee that approved the code or standard was balanced to assure that individuals from,competent and concerned interests have had an opportunity to participate. The proposed code or standard was made,available for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.,ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.,ASME does not take any position with respect to the validity of any patent rights asserted in connection with any,items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for,infringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expressly,advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is,entirely their own responsibility.,Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as,government or industry endorsement of this code or standard.,ASME accepts responsibility for only those interpretations of this document issued in accordance with the established,ASME procedures and policies, which precludes the issuance of interpretations by individuals.,No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.,The American Society of Mechanical Engineers,Three Park Avenue, New York, NY 10016-5990,Copyright . 2008 by,THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS,All rights reserved,Printed in U.S.A.,--`,``,`,,,````````,`,`,`,`,,,-`-`,,`,,`,`,,`---,ERRATA,to,ASME PCC-3–2007,Inspection Planning Using,Risk-Based Methods,There will be no automatic addenda subscription service issued to ASME PCC-3–2007. Also,the interpretations will be published on the ASME Web site under the Committee Pages at,http://cstools.asme.org as they are issued.,THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS,Three Park Avenue, New York, NY 10016-5990,August 2008,A0168E,--`,``,`,,,````````,`,`,`,`,,,-`-`,,`,,`,`,,`---,--`,``,`,,,````````,`,`,`,`,,,-`-`,,`,,`,`,,`---,INTENTIONALLY LEFT BLANK,CONTENTS,Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv,Committee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v,1 Scope, Introduction, and Purpose. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,2 Basic Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,3 Introduction to Risk-Based Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,4 Planning the Risk Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9,5 Data and Information Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13,6 Damage Mechanisms and Failure Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15,7 Determining Probability of Failure . . . . . . . . . . . . . . . . . . . . . . . . . ……

……